Sep 15, 2025

Relevant requirements for screens

Leave a message

Screens must be installed before sewage treatment systems or water pumps. The amount of suspended solids and floating solids (collectively referred to as screen residue) that can be intercepted by the screen varies greatly depending on the selected gap width between the bars and the nature of the sewage. The gap width between the screen bars should meet the following requirements: before the sewage treatment system, it should be 16~25mm when mechanical removal is used, and 25~40mm when manual removal is used; before the pump, it should be determined according to the requirements of the water pump. If the gap width between the bars of the water pump screen is not greater than 20mm, the screen can be installed in front of the sewage treatment system. The amount of screen residue is related to the gap width between the bars: when the gap width between the bars is 16~25mm, the amount of screen residue is 0.10~0.05m3/103m3 sewage; when the gap width between the bars is 25~40mm, the amount of screen residue is 0.03~0.01m3/103m3 sewage. A workbench should be set up behind the screen, which should generally be 0.5m higher than the highest water level upstream of the screen. For screens with manual slag removal, the length of the workbench along the water flow direction should not be less than 1.2m, and for screens with mechanical slag removal, the length should not be less than 1.5m, and the width of the aisles on both sides should not be less than 0.7m.

Send Inquiry