Acceptance and commissioning of wastewater treatment equipment after installation

Leave a message

1. After the installation of wastewater treatment equipment is completed, strict inspection and acceptance must be carried out. Check whether the appearance quality, safety facilities and electrical circuits of the wastewater treatment equipment comply with relevant regulations, and conduct mesh tests and effect tests.

2. The commissioning of wastewater treatment equipment must be carried out item by item. Wastewater treatment equipment must be debugged item by item according to the design drawings to check whether the equipment is operating normally and whether it can meet the design requirements.